Conceptual budgeting

Use the Conceptual Budgeting workspace

Turn early project information into saved budget rounds, review historical comparisons, and export a proposal and schedule of values.

Where to goProject › Conceptual BudgetingOpen ScrubPlan

Before you begin

Open your project and select Conceptual Budgeting, immediately to the left of Contract Documents. Have a project narrative or conceptual drawings ready, and confirm your organization’s bid package catalog is configured.

Automated price comparisons use your organization’s historical data. We recommend at least three comparable projects in the same market sector. You can enter manual rates or total costs when historical support is missing. Conceptual Budgeting remains available in Bid Management Only; its AI work can still incur usage charges.

Create a budget round

  1. Select Create New Budget. Give the round a clear name, such as Concept estimate — Round 1.
  2. Confirm the project context. Enter the market sector and check the city and state or region. Building square footage and site acreage are optional; add them when known.
  3. Add your source documents. Upload narratives or conceptual drawings as PDF, TXT, Markdown, PNG, JPEG, or WebP. Keep each file within 20 MB and the combined upload within 40 MB.
  4. Select Build. ScrubPlan identifies likely packages and develops scope and historical comparisons. You can leave the workspace while it works and return to the saved round. If work fails, use Retry unfinished analysis.

Review the scope and evidence

Check every package against your intended scope. Edit its Scope description, add a missing package with Add bid package, or remove one that does not apply. Open Comparisons & assumptions to inspect the source projects, pricing evidence, rationale, and warnings.

Unpriced means information is missing.

A missing rate, quantity, or project size is not treated as a confirmed zero. Totals can include only the amounts currently known. Resolve unpriced rows before presenting the budget as complete.

Set prices and materials

Pricing methodHow to use it
Building $/SFChoose or enter a rate. The base estimate uses the round’s building square footage. Add building SF to calculate the amount.
Total costEnter a lump sum directly. This works without building SF or historical evidence.
PercentageAvailable for eligible additional costs. General Conditions and General Requirements use the trade subtotal. Other eligible markups use trades plus GC/GR, without compounding on one another.
MaterialsAdd manual lines or select historical material groupings. Review the unit, quantity, historical average or range, and selected unit cost. Material costs add to the package’s base estimate.

Check for overlap before adding materials to a package that already includes those costs in its base rate or lump sum. Review the trade subtotal, additional costs, total, and remaining unpriced items after each adjustment.

Save rounds and export

  1. Select Save budget changes. On-screen totals are a preview until you save. Resolve the save or discard prompt before changing rounds.
  2. Keep estimates organized. Select a saved round from Budget rounds, or create a new named round for another estimate.
  3. Open Export budget. Choose the saved round and select Create files. ScrubPlan prepares a project-specific PDF proposal and an Excel schedule of values, then saves them in the workspace.
  4. Download and review. Use the PDF and Excel buttons in the export history. Check scope, assumptions, exclusions, financial figures, and source support before sharing.

Exports use the saved budget and project information. A completed proposal can be reused while that information stays unchanged; changes can require a new AI draft and additional usage. Prior saved exports remain available in the export history.

Keep the budget separate from bid publication

A conceptual budget is an early estimate supported by assumptions and available comparisons. Building or exporting a round does not publish bid invitations or approve subcontractor pricing. Continue through your normal package and invitation workflow when the project is ready to bid.