Historical Data
Use Historical Data
Build a searchable cost history from approved bids, project information, and material unit costs.
Before you begin
- Access to the projects you want to review.
- Approved historical bids, or a completed project you are ready to add.
- For cost-per-square-foot comparisons, a reliable building area for the relevant bid round.
Follow these steps
Open your cost history
Select Historical Data in the workspace navigation. The page brings together search, cost distribution charts, and project, package, and material views.
Check each project's status. A synced project has an approved historical snapshot; a pending project may still need preparation or approval.
Add a completed ScrubPlan project
Select Add project to Historical Data, search by project name or number, and choose a project marked Ready to add. Its bid deadline must have passed.
Enter applicable additional project costs and the Key Project Metric, then select Add project. Additional cost fields include general conditions, general requirements, owner contingency, construction contingency, insurance, bonds, permits, and fee.
For projects prepared through the historical-data approval workflow, review the proposed bid snapshot before approving it. This preparation becomes eligible 72 hours after the bid deadline.
Choose how to browse
Use the View dropdown to switch between Project, Package, and Materials. Open Filters to narrow results by state, city, market sector, or construction type. Select Clear filters to broaden the results again.
Open a project and its bid round
Open a historical project to review the saved drawing version or imported bid round. Expand the round to see its approved cost, building area, bid deadline, and package pricing.
Expand a package to inspect the bidders and available quote records. Keep the bid round and scope in view when comparing prices from different projects.
Review project information
Check the building area, location, market sector, available plan information, and additional costs. Use Edit project details to correct the market sector or city and state.
Plan information depends on the documents and information available for that project. An imported history-only project can have approved bids even when drawing facts have not been extracted.
Ask a question
Enter a question in Search Historical Data and select Search. For example: “What have we paid per square foot for electrical work on laboratory projects?” or “What approved unit costs do we have for fume hoods?”
Read the answer together with its Sources. Open the linked project or bid record to verify the price, scope, unit, and date.
Keep an approved snapshot current
For a synced ScrubPlan bid round, select Refresh historical data. Review the drawing version, current low bidders, amounts, package coverage, and warnings before selecting Confirm refresh.
Confirming replaces that round's approved snapshot and retains the prior revision in its audit history. Imported BuildingConnected rounds are updated through the BuildingConnected import review workflow.
An approved historical amount is a benchmark from a particular project and bid round. Confirm whether it represents a low bid, a material-only price, or another stated basis before using it in an estimate.
If something is missing
The project is unavailable to add
Confirm that you can access it, its bid deadline has passed, and it has not already been synchronized. The picker displays eligibility beside each project.
Search shows a supporting-file message
Project details and approved pricing may remain searchable while supporting files are being prepared or are temporarily unavailable. Check the available sources and try again after preparation finishes.
A price does not appear in the averages
Check approval status, package mapping, building area, and the active filters. Extracted material results waiting for review are not yet part of the approved historical snapshot.
